Date : May 13, 2025
TO : BPI Excom, ALL SBUs
From : Luis Sanchez Jr.
Subject : Lot Monumenting
TITLE : Lot Monumenting for Saleable Lots
1. What is the concept/Idea/Plan? (5W1H)
1.1. What : Lot Monumenting
1.2. Who : All concerned
1.3. When : May 14, 2025
1.4. Why : To accurately locate plots
1.5. Where : All projects
1.6. How much: Php 20 pesos per monument (final amount to be determined after first batch)
2. OBJECTIVE
2.1. To accurately and quickly locate plots
3. Situation
Plot location takes up alot of the time of site employees and is susceptible to error
4. PROBLEM (what is lacking, what pisses you off)
We recommend using monuments to present each corner and center point of the saleable blocks. Monuments will be made of concrete to be molded into PVC pipes
Materials:
12 inch long 3" PVC pipes (cut one side lengthwise)
1,360 cubic cm Mortar per pipe
Tie Wire
Concrete nail
Methodology:
Initial test production of 20 pieces of monument in HAMP. Pour mortar into each of the cut PVC pipes. Curing period is around 3-4 days per monument
Concrete nail to be placed in the middle of each monument
Monuments will be buried
Nylon string to be tied on each end of monument as guide when locating plots.
GE will have a monument for each of the 4 corners. For lawn lots, monuments will be placed for the for 4 corners of each block and the block's center point. Option to divide into smaller clusters (50-100 lots) for big blocks. Each cluster will have monuments for each of the corners and the center point
5. RESOURCES NEEDED
5.1. Cash Php 20 per monument
6. PLAN/PROJECT/IMPLEMENTATION/TIMELINE
6.1 Start initial batch in HAMP. Install monuments in Lawn 8A
7. REPORTS TO BE SUBMITTED
7.1. Pictures
7.2. Plan depicting monument location
8. DEGREE OF CONFIDENCE (FACTORS THAT WILL ENSURE PROJECT SUCCESS/VIABILITY/SUSTAINABILITY) I am 100% confident that this will ensure accurate and fast lot location
Prepared By: Checked By: Approved By: Luis Sanchez Jr. MRS JUS
On Fri, May 2, 2025, 8:15 PM Jorge Saguinsin <jorge@holygardens.ph> wrote:
We have discussed on various occasions monumenting projects for various mps sbus.Objectives1. To lessen incidence of wrong plots interment paling2 interments2 To facilitate tripping plot identificationOptions1. As is - problematic2. Concrete monument3. Black steel4. Gutter painting - fades is erasedWtdn1. Submit a project proposal 5w 1hetc. Timeline which sbu will be executing first, second soWho1. Suppliers of monument2. Who - ge assistantsHow - system of monumenting- locating triangulation during intermentquality check assurance to match sales map co, inventories